国产日产精品久久久久快鸭-中文字幕高清一区不卡-中文字幕在线都是精品-深夜福利亚洲一区二区

Q195 Q235 SAE1006 SAE1008 Galvanized Steel Wire Hot Dipped Galvanizing Iron Wire Binding Wire Gi Steel Wire 9 10 12 14 16 Gauge Electro Galvanized Iron Wire

Short Description:

Product DescriptionProduct NameCarbon Steel Wire for SpringStandardDIN 17223-1, EN10270-1, JIS G 3206, JIS G 3521, JIS G 3522,IS 4454, ASTM A 853-04, ASTM A 227, GOST 9389, GOST 14959UsageMechanical E...


  • Product model:

    Application

    Rope, Packaging, Netting, Manufacturing, Fencing, Construction

    Alloy or Not

    Non-alloy

    Standard

    BS, JIS, GB, ASTM, DIN, AISI

    MOQ

    3tons

    Payment Term

    Tt, 30%Deposit, 70%Balance

    Delivery Time

    Within 15 Days

    Transport Package

    Bag

    Specification

    0.2-12.5mm

    Trademark

    Tianming

    Origin

    China

    HS Code

    72171000

    Production Capacity

    30000tons/Month

Product Detail

Product Description

Product Name

Carbon Steel Wire for Spring
Standard

DIN 17223-1, EN10270-1, JIS G 3206, JIS G 3521, JIS G 3522,

IS 4454, ASTM A 853-04, ASTM A 227, GOST 9389, GOST 14959

Usage

Mechanical Equipment,Engineering Vehicle,Motor Vehicle,

Motorcycle,Accumulator Car,Bicycle,Fitness Equipment,

Elevator,Steel Wire Screen,Mattress And Sofa,Umbrella Frame,Electronic Products,ect.

Spring Usage

Compression spring,torsion spring,extension spring,

agricultural machines,die springs,strip&wire forming springs

Q195 Q235 SAE1006 SAE1008 Galvanized Steel Wire Hot Dipped Galvanizing Iron Wire Binding Wire Gi Steel Wire 9 10 12 14 16 Gauge Electro Galvanized Iron Wire
Q195 Q235 SAE1006 SAE1008 Galvanized Steel Wire Hot Dipped Galvanizing Iron Wire Binding Wire Gi Steel Wire 9 10 12 14 16 Gauge Electro Galvanized Iron Wire
FAQ:
Q1. How long can make delivery?
A: For stock products,will make shipments in 2-5 days after receiving deposit or receiving T/T;
for products need new production for common materials,usually make shipments in 7-10 days;
for products need special and rare materials,usually need 15-20 days to make shipment.

 

Q2. Can you provide the samples?
A:Samples can be provided with samples' charge and courier fee by the buyer's side.

Q3: Can we visit your factory?

A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow
up your case.


Q4. How do you ship the goods and how long does it take to arrive?
A: For mass products, ship freight is prefered.

 

Q5. Can you accept customize?
A: Yes. It can be customized as per the customers' request.


Leave Your Message


  • 主站蜘蛛池模板: | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |