国产日产精品久久久久快鸭-中文字幕高清一区不卡-中文字幕在线都是精品-深夜福利亚洲一区二区

ASTM-A240 JIS-G4304 En DIN 1.4301 1.4306 1.4404 Inox Sheet Hot/Cold Rolled AISI 304 304L 316 316L 316ti Stainless Steel Plate for Building Material

Short Description:

Product DescriptionProductStainless Steel Sheet and CoilSteel Grade200 Series: 201,202300 Series: 301,304,304L,316,316L,316Ti,309,310,317,321400 Series: 409,410,420,430,436,444,441,440cDuplex Steel: 9...


  • Product model:

    200 Series:201, 202

    300 Series:301, 304, 304L, 316, 316L, 317, 321

    400 Series:409, 410, 420, 430, 436, 444, 441, 440c

    Duplex Steel:904L, 2205, 2507, 2101, 2520, 2304

    Thickness:0.1mm-3mm, 3mm-16mm

    Width:10mm-2000mm

Product Detail

Product Description

ProductStainless Steel Sheet and Coil
Steel Grade200 Series: 201,202
300 Series: 301,304,304L,316,316L,316Ti,309,310,317,321
400 Series: 409,410,420,430,436,444,441,440c
Duplex Steel: 904L,2205,2507,2101,2520,2304
Thickness0.1mm-16mm
Width10mm-2000mm
Manufacturing MethodCold Rolled, Hot Rolled
SurfaceNo.1, 2D, 2B, BA, 8K mirror, No.4, Hairline, Sandblasting
EdgesMill Edges, Silt Edges
Surface TreatmentCorrugated, Perforated, Embossed, Etched, Water Rippled
MOQ1 Ton
Free SamplesAvailable
Per Coil Weight1-8 tons
Package Seaworthy packing with wooden pallets and waterproof paper
Leading timeUsually 10-15 days, if in stock 1-3 days.
Payment termsT/T 30% for deposit. 70% balance before shipment
Delivery TermsFOB/CIF/CFR/EXW
Raw Material SourceTisco, Baosteel, Qingshan or as Your Request

Applications

Related Products

Company Profile

Quality Control


FAQ

Q: Are you manufacturer? Can we visit your factory ?

A: Yes , we are a source steel factory in Wuxi,China. Welcome to visit.

Q. What are your main products ?
A: Main products are stainless steel, aluminum and copper for sheets, coils, pipes, bars.

Q: How do you control the quality?
A: Complete incoming material testing and production testing process to ensure that the quality of products can meet customer requirements. We also support the third party inspection before shipping.
 
Q: Can you arrange the shipment?
A: Sure, we have long-term cooperation with the freight forwarder, so we can get more favorable prices.
 
Q: How long is your delivery time?
A: Generally it is 1-3 days if the raw materials are in stock. Or it is 10-15 days if the goods are not in stock. It depends.
  
Q: Can we get the a free sample?
A: Yes. As long as we have it in stock.

18.jpg

Leave Your Message